Project Location: City Point, City of London
Project Type: Stairwell lighting

The Challenge

400ft high City of London landmark building with 36 storeys requiring full lighting / energy survey with a view to replacement of all stairwell fittings.

Client: Cofely
Sub-contractor: Beekmans Electrical

‘Both I and the client received outstanding service and support from Krishna in order to complete the initial stage of this project. As a result of the service we received this had lead to more opportunities being presented, and with the continuing support of Krishna and Rexel I am sure we will develop the Energy Saving side of our business further.’

Alan Quadir
Operations Manager | Beekmans Electrical

The Solution

An Energy survey was conducted to demonstrate savings to be achieved by replacing existing fittings. Recommendation made to install 435 fittings offering a dimming down facility and presence detection that enabled areas of low usage to remain lit at a minimum level, until occupied. The product offered simple installation, and the ability to have the settings adjusted to the customer’s exact requirements before they left the factory.

The Results

  • £74k saving in energy costs
  • Saving of 197 tonnes in CO2